Hydrogeology

Public relations

Back

Tesla construction site: piles in the groundwater (film)

According to the construction documents, piles are to be driven into the ground to stabilize the factory. Thousands of them are to be driven into the ground, also in the water protection area. We talk to construction and water experts about why this is allowed and how water protection can continue to be guaranteed.

RBB interview with Prof. Dr. Engelhardt

© Rundfunk Berlin-Brandenburg (rbb)

This Blog is updated continuously.

Related topics